Flooring Installation Melbourne

Discuss the product type, room layout, existing floor, substrate, access and finish details. The written quote confirms preparation, installation method, trims, cleanup and exclusions.

Flooring Installation Melbourne illustrative service concept

What can be scoped

Subfloor condition review
Moisture and substrate requirements
Underlay and acoustic requirements
Layout, cutting and edge detailing
Skirting, scotia and transition requirements
Cleanup and handover checks

Project stages

01

Project enquiry

Share the flooring type, rooms, existing floor, property access and intended timing.

02

Site and scope review

Review measurements, substrate condition, preparation, layout, trims and other project requirements.

03

Written quote

Confirm included preparation, installation work, exclusions, responsibilities, timing and price.

04

Installation and handover

Complete the accepted scope and review agreed finishing details and care information at handover.

Frequently asked questions

How long will flooring installation take?

Timing depends on the rooms, product, preparation, access and accepted scope. The proposed schedule is confirmed after those details are reviewed.

Can removal of the existing floor be included?

Removal and disposal can be discussed and are included only when they appear in the accepted written scope.

How do I confirm whether my address is serviced?

Send the property address with the enquiry. Frank Home Group will confirm availability and whether the location is in scope before quoting.

Explore More